Organic Centre, Rossinver, Co. Leitrim

Education Centre, Shop and Cafe

Date:

1995, completed 2000

Key features:

Laminated timber frame post and beam construction, with timber frame walls,insulated with cellulose Warmcell, native cedar cladding to external walls,grass roof,wetland waste water treatment, wood pellet boiler

Types of work:

Commercial/ Educational

Special areas:

Timber frame for flexability for future expansion of facilities

Other considerations:

Use of Local materials and services

 

For more information: www.theorganiccentre.ie/

 

 

 

 

Leitrim Sculpture centre, Manorhamilton, Co. Leitrim

Date:

2005-2007

Key features:

Restoration of parts of the urban fabric of the town of Manorhamilton and establishing a new use for existing buildings

Types of work:

Conversion of factory to Workshops/Studios and conversion of three storey terrace to Artists design studios

Special areas:

Mechanical ventilation heat recovery system in workshops/Studios

Other considerations:


For more information:




www.leitrimsculpturecentre.ie


 







 

 



© Colin Bell  Architect. All Rights Reserved













 

Make a free website with Yola